Motorists are asked to observe the “No Parking” signs which will be set out 48 hours in advance of the work. All vehicles will need to be moved from the street by 7 a.m. the day the work will begin. This is a fast-moving operation allowing the street to remain open for traffic and access to residences during the crack sealing operation. Once the “ No Parking” signs have been removed, the work is complete and residents can park on the street.
FAQ:
What is Crack Seal?
· Crackseal is a pavement preservation treatment designed to seal cracks in the asphalt, to prevent water from getting down into and under the asphalt.
Will Chip Seal get on my tires or my shoes?
· No, an agent is applied following the application that prevents it from sticking to your tires or shoes.
No Parking signs have been put up but, I do not see any work. What is going on?
· Occasionally weather delays can happen, equipment problems or other unavoidable delays may occur which could cause the delays. Please be patient.
Questions can be answered by calling Street Superintendent Tony Falgien at 719-269-9027.
Areas affected by this project will be as follows.
- Phelps from Central to Barr.
- 4-Mile Lane from CR 123 to end of pavement.
- East Main from Rainbow Drive to Sunwest Credit Union.
- Steinmeier from East Main to the county line.
- Yale from College to Harding.
- 16th Street from Fremont Drive to Franklin.
- Greenwood from 15th – 16th.
- 1st Street from New York to Mariposa.
- Bridge Street from R/R trestle to South 8th.
- South 8th from dead-end to Myrtle.
- Main Street from 4th – 7th.
- Main Street from 9th – 14th.
Homebuyer’s Workshop will be held Sept. 16
This one-day workshop will be held at the UAACOG building, 3224-A Independence Road, starting at 1 p.m. The workshop takes participants through the home buying process from loan application to loan closing and life as a homeowner. Lenders such as CHFA, Rural Development, and others require that borrowers participate in this type of training.
The workshop is free, however, reservations are required for the workshop and space is limited.
For more information, contact Central Colorado Housing (a department of UAACOG), at 719-269-7687, laura.yost@uaacog.com, https://ift.tt/3kNuSTO, or Facebook @ Central Colorado Housing.
"seal" - Google News
September 03, 2021 at 01:03AM
https://ift.tt/2V8DhZ8
Crack seal operations will take place in various neighborhoods Sept. 7-10 - Canon City Daily Record
"seal" - Google News
https://ift.tt/3c1qdrW
https://ift.tt/2SzWv5y
No comments:
Post a Comment